Civil engineering project
Our Projects

COMPLETED & ONGOING PROJECTS

Hindland delivers thermal, industrial, and infrastructure projects with strong engineering, safety, and on-time execution across diverse project environments.

forumTalk to our Team
engineering01
0

Ongoing projects listed

verified02
0+

Completed projects listed

bolt03
Power + Infra

Core industry segments

public04
Pan India

Execution across multiple states

Project Portfolio

Execution across power, infrastructure & industry

Live executionCurrent Execution Portfolio

Ongoing Projects

Hindland's ongoing assignments include thermal power plant works, CHP and FGD alignment, stacker & reclaimer erection, metro-related fabrication, and utility equipment erection.

06
Ongoing
bolt

NTPC North Karanpura Super Thermal Power Plant

Large-scale thermal power assignment

corporate_fare

Owner

NTPC

task

Scope

Erection and alignment

Value

Rs. 3 Cr.

Location

location_onKaranpura, Jharkhand

Ongoing
train

Patna Metro

Urban infrastructure and fabrication work

corporate_fare

Owner

Delhi Metro Rail Corporation

task

Scope

Erection and fabrication

Value

Rs. 3.2 Cr.

Location

location_onPatna, Bihar

Ongoing
factory

Khurja Thermal Power Plant 1320 MW

Thermal plant CHP and FGD assignment

corporate_fare

Owner

NTPC

task

Scope

Erection and alignment of CHP and FGD

Value

Rs. 4.5 Cr.

Location

location_onKhurja, Uttar Pradesh

Ongoing
precision_manufacturing

NTPC Lara Thermal Power Plant

Mechanical and civil execution work

corporate_fare

Owner

NTPC

task

Scope

Stacker and reclaimer erection, alignment work, and civil work

Value

Rs. 5 Cr.

Location

location_onChhattisgarh

Ongoing
electric_bolt

Panki Thermal Power Station

Utility and technological equipment works

corporate_fare

Owner

UP Govt.

task

Scope

Balance CHPS utility and technological equipment erection and alignment work

Value

Rs. 6.5 Cr.

Location

location_onPanki, Kanpur, Uttar Pradesh

Ongoing
conveyor_belt

Mahan Energen Limited – Adani Power

CHP erection assignment

corporate_fare

Owner

Adani Power

task

Scope

CHP erection and alignment work

Value

Rs. 4.6 Cr.

Location

location_onSingrauli, Madhya Pradesh

verifiedDeliveredDelivered Works

Completed Projects

The company profile lists completed works across India Bulls, Ratan India, NTPC, Nirma, railway infrastructure, fuel oil handling, CW piping, ash handling, and boiler turbine structure assignments.

12
check_circleCompleted
01factory

India Bulls Power Projects 270 × 5 MW

High-capacity thermal power project

corporate_fare

Owner

India Bulls Group

electric_bolt

Capacity

1350 MW consisting of five units of 270 MW each

settings

Technology

Originally built using BHEL-manufactured units

task

Scope

Boiler structure, coal pipe, P-91 piping, CS LP piping, hangers and supporters

Value

Rs. 9.92 Cr.

Location

location_onNandgaonpeth, Amravati, Maharashtra

check_circleCompleted
02architecture

Ratan India Power Projects 270 × 5 MW

Thermal power structural assignment

corporate_fare

Owner

Ratan India

electric_bolt

Capacity

1350 MW consisting of five units of 270 MW each

task

Scope

Structure of TG House

Value

Rs. 3.28 Cr.

Location

location_onSinnar, near Nashik, Maharashtra

check_circleCompleted
03science

Nirmal Chemical Factory, Bhavnagar

Industrial structure and erection work

corporate_fare

Owner

Nirma Group

task

Scope

Structure, fabrication and erection

Value

Rs. 1.50 Cr.

Location

location_onBhavnagar, Gujarat

check_circleCompleted
04bolt

NTPC Nabinagar

Fabrication and erection assignment

corporate_fare

Owner

NTPC

task

Scope

Structure, fabrication and erection

Value

Rs. 5.5 Cr.

Location

location_onNabinagar, Bihar

check_circleCompleted
05train

Railway Project

Infrastructure bridge erection work

corporate_fare

Owner

Railway

task

Scope

Railway bridge erection

Value

Rs. 3.25 Cr.

Location

location_onOdisha

check_circleCompleted
06engineering

Panki Thermal Power Plant

Maintenance and operation work

corporate_fare

Owner

UP Govt.

task

Scope

Maintenance and operation

Value

Rs. 2.2 Cr.

Location

location_onPanki, Kanpur, Uttar Pradesh

check_circleCompleted
07foundation

ERA Infra Limited

Historic boiler turbine structure work

task

Work

Boiler turbine structure work

calendar_month

Period

Fabrication and erection from 2007 to 2009

Worth

Over Rs. 5.60 Cr.

check_circleCompleted
08whatshot

Vasvi Power

Boiler turbine structure works

task

Work

Boiler turbine structure work

calendar_month

Period

Fabrication and erection from 2008 to 2009

Worth

Rs. 4.9 Cr.

check_circleCompleted
09local_gas_station

Thermosystem Pvt. Ltd.

Fuel oil handling system execution

task

Work

Fuel oil handling system

calendar_month

Period

Project execution work from 2012 to 2013

Worth

Rs. 1.75 Cr.

check_circleCompleted
10settings

Unitech Machine Limited

Rotary equipment erection

task

Work

Rotary equipment erection

calendar_month

Period

Erection work from 2012 to 2014

Worth

Rs. 1.9 Cr.

check_circleCompleted
11plumbing

Technofab Engineering Ltd.

Piping installation works

task

Work

CW piping and LP piping installation

calendar_month

Period

Erection work from 2012 to 2014

Worth

Rs. 2.20 Cr.

check_circleCompleted
12blur_on

BSBK

Ash handling system project

task

Work

Ash handling system

calendar_month

Period

Project execution from 2013 to 2014

Worth

Rs. 1.3 Cr.

Pan-India Reach

Execution Across Multiple States

From Jharkhand to Gujarat, Bihar to Chhattisgarh — our teams bring specialized engineering expertise to India's most critical industrial and infrastructure projects.

JharkhandBiharUttar PradeshChhattisgarhMadhya PradeshMaharashtraGujaratOdisha
bolt8+Thermal Power
conveyor_belt6+CHP / FGD
train2Metro & Rail
plumbing3+Piping Works
foundation5+Structural
engineering2O&M
precision_manufacturing6+Fabrication
settings4+Equipment

PLANNING YOUR NEXT PROJECT?